The pit for the rising stage taking shape Concrete blocks have arrived to start forming sleeper walls to support the new floor joists The decorator paints up a sample area showing the new worship area colours The pit for the rising stage with the covered pew in storage behind it
  Armitage have managed to squeeze a mini digger to help excavate the pit and floor trenches One of the two new boilers in place on its frame  
       

 